Press "Enter" to skip to content

Power cuts in different parts of Jammu from June 29 to July 2

Superintending Engineer O&M Circle, Jammu, JPDCL has informed that to execute various development works, the power supply to Industrial Areas PHE, Muthi Barnai and their adjoining areas shall remain affected on June 29 and July 1 from 6 am to 10 am.

Similarly, the power supply to Kailash Nagar, Shakti Nagar, Patel Nagar, Canal and their adjoining areas shall remain affected on June 29 and July 1 from 6 am to 10 am.

Likewise, the power supply to Barnai, Nater Cota,  Lower Muthi, KC Door, PHE adjoining Lower Barnai, Industrial Area and their adjoining areas shall remain affected on June 30 and July 2 from 6 am to 10 am.

 Similarly, the power supply to Industrial Area of SIDCO Bari-Brahmana shall remain affected on June 29 from 5 am to 9 am.

Meanwhile, Superintending Engineer (Distribution) JPDCL, O&M Circle, Kathua has informed that to carry out work on outgoing feeder and laying of cable for capacitor bank, the power supply to Ward No. 10, 11, Jarai, PHE, Footbridge, District Court, Old Bus Stand and adjoining areas shall remain affected on June 30 from 5 am to 11 am.

Similarly, for charging of 11 KV HT Cable for Oxygen Factory, the power supply to Kohinoor Industry and Balaji Industry shall remain affected on June 29 from 8 am to 8.30 am.

Likewise, the power supply to SICOP Industrial Area shall remain affected on June 29 from 8 am to 9 am.

Similarly, for laying of 11 KV Line and jumpering work of 66 KV line, the power supply to PHE Samba shall remain affected on June 29 from 5 am to 10 am.